I will be testing everything I possibly can. The only catch is, it will take much longer to test products this time around. Possibly a week per product. Reasons being....

1 - Testing at seven different temps. It will take time to bring products to each temp.

2 - Testing at different levels. This doesn't add much time, but will give a clearer picture of performance.

3 - Multiple tests for each product to check for consistency. Etc.

That said, last time I tested 28 products over about a years time before the rig failed. This time, the rig will have to funds to build it so it doesn't fail, so in a years time I could test 52 products.